The department coordinated, in cooperation with the Park and Public Works Departments, the trail improvements along the Arkansas River between 4th Street and Runyon Lake.
The 1st phase included the construction of 2,500 linear feet of 10-foot wide concrete trail.
The 2nd phase, which is currently under construction, includes reinforcing the White Water Park kayak course drop structures with grouted riprap, installing the remaining 2,500 linear feet of concrete trail between Main Street and I-25 and improving the plaza at the drop-off area near the 1st drop structure on the kayak course.